Current time: Refresh

Agencies » Toronto TTC

Subway service tonight on Line 1 between St Clair and Sheppard-Yonge stations will end at 11 p.m. for planned track work. Shuttle buses will operate. See other service alerts. (Updated May 17 )
This Saturday and Sunday, there will be no subway service on Line 1 between St Clair and Sheppard-Yonge stations due to planned track work. Shuttle buses will operate. St Clair and Sheppard-Yonge are accessible stations. Regular subway service will resume Monday morning by 6 a.m. See other service alerts. (Updated May 16 )

Remove ads by becoming a Premium User

 • : 86-Scarborough at Cedar Dr on Eglinton Ave East going West to Kennedy Station

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 Mins
at . 2:37 ahead of Vehicle 1299 Load 101%?

2: 13 Mins
at . 2:32 ahead of Vehicle 3444 Load 96%?

3: 22 - 25 Mins
at . 3:09 ahead of Vehicle 3529 Load 89%?

4: 32 - 35 Mins
at . 3:09 ahead of Vehicle 3471 Load 95%?

5: 42 - 45 Mins
at . 3:09 ahead of Vehicle 1231 Load 95%?

86D Temporary route change due to road closure
More...

Vehicle 3471 on Route 86 at Generation Blvd on Meadowvale Rd heading North

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.