Current time: Refresh

Agencies » Washington WMATA

Remove ads by becoming a Premium User

 • : Metrorail Green Line at Greenbelt, Green/Yellow Line Center Platform going Greenbelt

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 3 - 5 Mins
at . 14:14 behind Vehicle 527 Empty

2: 11 Mins
at . 1:42 behind Vehicle 529 Load 75%? Empty

3: 21 Mins
at . 7:52 ahead of Vehicle 531 Load 104%? Empty

4: 33 Mins
at . 3:18 behind Vehicle 533 Load 112%? Empty

5: 49 Mins
at . 0:00 behind Vehicle 537 Load 295%? Empty

Trains operating every 10-20 mins w/ single tracking btwn Naylor Road & Branch
Avenue due to scheduled maintenance. Info: https://www.wmata.com/weekend.

Trains operating every 10-20 mins w/ single tracking btwn Naylor Road & Branch
Avenue due to scheduled maintenance. Info: https://www.wmata.com/weekend.
Some trains operating btwn Greenbelt & Southern Avenue only due to scheduled
maintenance. Use Green Line to Branch Avenue to continue trip.

Some trains operating btwn Greenbelt & Southern Avenue only due to scheduled
maintenance. Use Green Line to Branch Avenue to continue trip.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.