Current time: Refresh

Agencies » Washington WMATA

Remove ads by becoming a Premium User

 • : Metrorail Green Line at Southern Ave, Green Line Center Platform going Greenbelt

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 1:41 - 2 Mins
at . 21:39 behind Vehicle 517 Load 149%? Empty

2: 8 Mins
at . Waiting 7:54. 8:22 behind Vehicle 521 Load 67%? Empty

Trains operating every 10-20 mins w/ single tracking btwn Naylor Road & Branch
Avenue due to scheduled maintenance. Info: https://www.wmata.com/weekend.

Trains operating every 10-20 mins w/ single tracking btwn Naylor Road & Branch
Avenue due to scheduled maintenance. Info: https://www.wmata.com/weekend.
Some trains operating btwn Greenbelt & Southern Avenue only due to scheduled
maintenance. Use Green Line to Branch Avenue to continue trip.

Some trains operating btwn Greenbelt & Southern Avenue only due to scheduled
maintenance. Use Green Line to Branch Avenue to continue trip.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.