Current time: Refresh

Agencies » Washington WMATA

Remove ads by becoming a Premium User

 • : Metrorail Green Line at Branch Ave, Green Line Center Platform going Branch Ave

Prev Stop | Next Stop | Near Stops | Schedule | Set Destination

1: 13 Mins
at . 0:53 ahead of Vehicle 514 Load 117%? Empty

2: 34 Mins
at . 0:21 ahead of Vehicle 518 Load 94%? Empty

3: 44 Mins
at . 10:06 behind Vehicle 520 Load 81%? Empty

Trains operating every 10-20 mins w/ single tracking btwn Naylor Road & Branch
Avenue due to scheduled maintenance. Info: https://www.wmata.com/weekend.

Trains operating every 10-20 mins w/ single tracking btwn Naylor Road & Branch
Avenue due to scheduled maintenance. Info: https://www.wmata.com/weekend.
Some trains operating btwn Greenbelt & Southern Avenue only due to scheduled
maintenance. Use Green Line to Branch Avenue to continue trip.

Some trains operating btwn Greenbelt & Southern Avenue only due to scheduled
maintenance. Use Green Line to Branch Avenue to continue trip.

Add stop (different agency)

Settings (enable more features)

Stops near me by GPS going North East South West

TransSee by Darwin O'Connor. Follow on Twitter.